[ Problem Point ]
If there is no way of drying the water as soon as the test was in trouble.
[ ⇒Kaizen Point ]
The high-temperature heating with the Air Blow Heater blower capacity.
We can work faster, more and more test cases.
We flew with residual heat of water, the rust was coming out.