Skip to content

HEAT-TECH

Search
  • Adoption record
  • Catalog
  • Custom-made example
  • HS&HTS CODE
  • Order and payment method
  • Quarterly News Letter
  • Quotation Request
  • RoHS Directive 10 Substances Non-Usage Certification Request
  • Test Laboratory KOBE
  • Test piece heating register
  • World Network
  • Company Information
  • Privacy Policy
  • Inquiry&Contact Us
  • Problem solving process
  • Welcome to the direct-sales site of high-tech heaters and industrial instruments!
PEEK-Tough Tape Best Applications List

No.4 End stop of a solar panel

Saturday September 15th, 2012 HEAT-TECH info

INDEX

  • [ Problem Point ]
      • [ Kaizen Point ]

[ Problem Point ]

It takes time before glue dries.

[ Kaizen Point ]

The solar panel was stopped on the frame on the Toughtape. Since the lasting heat resistance of 260 ℃ and form are stable, fixation is possible in an instant and it also OKs a pile. Productivity went up.

Related page:

No.3 End stop before heat shrinking of cloth No.24 Detailed examination of the solar panel (photovoltaic module) No.44 Evaluation test on solar panel No.10 Outer stop winding and interlayer insulating transformers and coils No.2 End surface of the film take-up fixed No.7 Fixed position of the exposure apparatus No.1 Splicing and connecting the film Silica glass heated by Far Infrared Panel Heater

Post navigation

Previous PostNo.3 End stop before heat shrinking of clothNext PostNo.5 Scald the vial

Best Technology Online Shop

Proudly powered by WordPress
Exit mobile version