[ Problem Point ]
Rising of the heater is slow,therefor it can’t correspond to work of the special express job.
[ ⇒Kaizen Point ]
Dried by the Halogen Line Heater after soaping the dyed fabric.
Since the maximum temperature heated up in 5sec, immediately after the start of operation could work.
The idling time vanished, the current spending 30 minutes in idling until PID steady.
In addition, the amount of electric use decreases, and the exhaust of CO2 has decreased, too.